The Contracting Education Academy

Contracting Academy Logo
  • Home
  • Training & Education
  • Services
  • Contact Us
You are here: Home / Archives for Program of Record

May 16, 2019 By AMK

Two changes Congress can make to speed space acquisition

We now live in a world of accelerated technological advancement. Moore’s Law has come home to roost in the space business. Taking seven to 10 years to develop and deploy operational space systems is no longer efficient nor acceptable.

Recently, as pointed out by the U.S. Government Accountability Office, America’s adversaries have been turning technology in three to four years, while the U.S. is turning technology in seven to 10 years. For the last 25 years, we have been the unchallenged world leaders in space technology. However, if this trend continues it will not be very long until we fall behind. This has been recognized by the GAO and congressional and Air Force leadership. To respond, we must figure out how to move fast, insert technology quickly and respond to rapid technology insertion by our adversaries. Therefore, we need to increase our risk tolerance, and build systems faster and more affordably, allowing us to deploy resilient constellations that can endure losses, and still provide mission capability. To retain system agility and resilience, we cannot afford to buy and field technologically “old” systems up to a decade after program initiation.

In the past, we deployed systems very quickly. The first Defense Meteorological Satellite Program satellite was built in 10 months, but we did this with a high tolerance for risk. While we were risk tolerant, Gen. Bernard Schriever and the early military space pioneers realized that problems in high-technology, low-volume developments would occur, and therefore built in cost and schedule margin. This margin allowed rapid and efficient addressing of problems and issues as soon as they occurred.

Keep reading article at: https://spacenews.com/op-ed-two-changes-congress-can-make-to-speed-space-acquisition/

Filed Under: Government Contracting News Tagged With: Air Force, cost margin, Defense Meteorological Satellite Program, flexibility, Mission of Record, Program of Record, rapid technology, reduced budget, risk-tolerant, schedule margin, space, space systems, space technology, technological advancement

Popular Topics

abuse acquisition reform acquisition strategy acquisition training acquisition workforce Air Force Army AT&L bid protest budget budget cuts competition cybersecurity DAU DFARS DHS DoD DOJ FAR fraud GAO Georgia Tech GSA GSA Schedule GSA Schedules IG industrial base information technology innovation IT Justice Dept. Navy NDAA OFPP OMB OTA Pentagon procurement reform protest SBA sequestration small business spending technology VA
Contracting Academy Logo
75 Fifth Street, NW, Suite 300
Atlanta, GA 30308
info@ContractingAcademy.gatech.edu
Phone: 404-894-6109
Fax: 404-410-6885

RSS Twitter

Search this Website

Copyright © 2023 · Georgia Tech - Enterprise Innovation Institute